Omschrijving

*****De aanmeldingsdeadline is bereikt. U kunt zich niet meer aanmelden. I.v.m. de veiligheidsbepalingen heeft het geen zin om -indien u niet op de deelnemerslijst staat- op de bonnefooi te komen.*****

Recent tunnel projects have shown that immersed tunnels are not only feasible in waterways, but that they can be competitive to long span bridges or bored tunnels under more challenging circumstances. Immersed tunnels have been constructed successfully in water depths up to 58 m below sea level, in very poor soil conditions, with increasing lengths, increasing design lives and above all under offshore conditions. Since the technique is very mature in the Netherlands, Dutch companies are involved in many of these projects, and as such this construction method can be considered as a Dutch export product.

DETAILS
* Sandwiches will be available at 18.00h.
* Sandwiches beforehand and drinks afterwards are offered with the compliments of TEC/RHDHV.
* Registration latest on 11 March.

Spreker(s)

Hans de Wit (Managing Director TEC (RHDHV), Nhut Nguyen (Design Manager BAM Infraconsult) and Eelco van Putten (Lead Engineer TEC (RHDHV).

Locatie

Vijverzaal, Head Office Royal HaskoningDHV

Laan 1914 No. 35, Amersfoort

Organisator

Offshore Techniek

Naam en contactgegevens voor informatie

More information at

info@kivi.nl