Omschrijving

Bluewater’s Haewene Brim Floating Production Storage and Offloading (FPSO), moored by an internal turret mooring system in the North Sea since 1998, ran out of its original 15 years design life. Good field performance and the tie-in of another field resulted in a lifetime extension of 18-20 years. The system suffered from some serious integrity issues (birdcages in spiral strand wire sections) over the last few years of its original design life, which made it challenging to fulfil the design life and to design a new mooring system within the targeted boundary conditions. A number of the findings, challenges and phased offshore installation campaigns with FPSO in place and in production will be presented.

DETAILS
* Sandwiches beforehand and drinks afterwards are offered with the complements of Bluewater.
* Register soon due to limited space.
* Until 15 November you can indicate with your registration if reserving sandwiches is necessary for you.
* After 15 November there may be a possibility to registrate -if not fully booked- but no sandwiches will be reserved for you. You will expected by 19.00h then.

Spreker(s)

Richard Leeuwenburgh (Section Head Mooring and Subsea at Bluewater).

Locatie

KIVI Building,

Prinsessegracht 23, 2514 AP Den Haag

Organisator

Offshore Techniek

Naam en contactgegevens voor informatie

More information at

info@kivi.nl