Well Intervention: Assuring Flow
Omschrijving
CHANGE OF LOCATION!!!
Traditionally access to subsea wells is considered more difficult and represents a large cost compared to wells with direct platform access. With the latest developments in light well intervention handling equipment the costs of intervention operations on subsea wells can be reduced significantly, even in harsh environments, while increasing the operations quality by more accurate control from the surface. An integral design approach provides opportunities to optimize the well intervention operation, both on new built and existing vessels. The presentation will take the audience through the module handling system design process and highlight its key aspects.
DETAILS
* Sandwiches beforehand and drinks afterwards are offered with the compliments of IHC.
* Until 15 December you can indicate with your registration if reserving sandwiches is necessary for you.
* After 15 December there may be a possibility to registrate -if not fully booked- but no sandwiches will be reserved for you. You will expected by 19.00h then.
Spreker(s)
Florian van den Broek (Manager Integrated Design and Estimation IHC Mission Equipment).
Locatie
KIVI Building, Prinsessegracht 23,
2514 AP Den Haag
Organisator
Offshore Techniek
Naam en contactgegevens voor informatie
More information at