Valhall Largest Offshore deck
Omschrijving
Lezingenavond met als onderwerp: 'Valhall Largest Offshore deck built in the Netherlands''.
Fabrication of the 11.000 tonnes Valhall Re-Development Integrated Production and Hotel deck started November 2007. This project is the largest complex project in the history of Heerema Zwijndrecht and amounted to 2.500.000 man hours. On 30 January 2010, the site move took place at the yard, because the maximum building height was reached in one of Europe largest fabrication halls. During the move the super module was driven out of the fabrication hall on 70 multi-wheel trailers supplied by Mammoet, amounting to a total of 1,672 wheels. After final completion the deck left the quayside in July amounting to 100 meters long, 47 meters wide and 50 meters high topside. The project was designed for 40 years and built to high specifications.
Spreker(s)
Ronald Wiebes, Project Manager of Heerema Fabrication Group B.V.
BIJZONDERHEDEN
* Er is om 18.00 uur gelegenheid tot deelname aan de gesponsorde broodmaaltijd.
* De broodmaaltijd vooraf en de borrel na afloop worden aangeboden door Heerema Marine Contractors.
* De borrel na afloop wordt gehouden in café "de Posthoorn" op het Lange Voorhout.
* Tot uiterlijk 16 november kunt u aangeven of u aan de broodmaaltijd wilt deelnemen.
* Na 16 novemberr kunt u zich -zolang het maximum aantal deelnemers nog niet bereikt is - nog wel aanmelden, maar is er voor u geen broodmaaltijd gereserveerd. U wordt dan om 19.00 uur verwacht.
Locatie
KIVI NIRIA Gebouw, Prinsessegracht 23
2514 AP Den Haag
Organisator
Offshore Techniek
Naam en contactgegevens voor informatie
Nadere informatie bij onderstaand e-mailadres