Project A2 Hooggelegen + ALV Geotechnics
Description
During the general members' meeting at Trajectum Novum in Utrecht, the state of affairs regarding the geotechnical department will be explained. Afterwards, the A2 Hooggelegen project will be presented in combination with an excursion to the construction site. The A2 Hooggelegen project covers the widening and partial relocation of the A2 motorway between the Leidsche Rijn tunnel and the Oudenrijn interchange to 2 x 5 lanes and the construction of a city road with 2 x 2 lanes. The project is being realised by an Alliance formed by Rijkswaterstaat and the contractor combination Trajectum Novum. The afternoon will conclude with drinks.
The (provisional) programme is as follows:
13.00 Reception
13.15 General Meeting of Members
14.15 Introduction Alliantie contract A2 Hooggelegen, description of work / project / cooperation within alliance by member of management team Projectbureau A2 Hooggelegen
15.00 Geotechnical challenges A2 Hooggelegen by ir. A. Ramkema, project engineer Geotechnical Engineering at Project Office A2 Hooggelegen
15.45 Break
16.00 Excursion on the construction site
17.00 Drinks
PARTICIPANTS
- Registration before 2 February 2009.
- You are requested to bring your own personal safety equipment (helmet and shoes) if possible.
Location
Trajectum Novum (formerly known as
Mobilion), Groenewoudsedijk 2a, Utrecht.
Organiser
Geotechnics
Name and contact details for information
Further information from Congress Bureau KIVI NIRIA, telephone 070 3919890, e-mail congres@kiviniria.nl or Erwin de Jong using the e-mail address below.
