FLNG: Into Phase of Reality
Description
Lecture evening on the topic: FLNG: Into Phase of Reality.
For some years already offshore industry is preparing for a leap forward: offshore Floating production of Liquefied Natural Gas (FLNG). Shell has sanctioned the Prelude FLNG project, the first real FLNG project formally announced to go ahead. The SBM Offshore group will be involved in this Shell project through the design and delivery of the turret mooring system, but meanwhile SBM Offshore is active as leading partner in consortia dealing with (Pre-) FEED studies for other FLNG projects.
These huge, capital intensive, projects require a sound technical approach towards selection of topsides technology, layout, containment systems for storage of LNG, mooring and offloading facilities. Various interesting technical aspects of the FLNG projects will be dealt with in the presentation.
Speaker(s)
Taco Terpstra, Senior Project Manager and Hajo Helleman, Engineering Project Manager at SBM Schiedam.
PARTICIPANTS
* There will be an opportunity to join the sponsored bread meal at 18:00.
* The bread meal beforehand and the drinks afterwards will be offered by SBM Schiedam.
* Until 14 February at the latest, you can indicate whether you want to participate in the bread meal.
* After 14 February, you can still register -as long as the maximum number of participants has not yet been reached-, but no bread meal will be reserved for you. You will then be expected at 7pm
Location
Caland Building, Doormanweg 66,
3115 JD Schiedam
Organiser
Offshore Technology
Name and contact details for information
Further information at the e-mail address below.
