Annual meeting and ITA discussion evening
Description
You are welcome from 17.30.
This evening will feature the Annual General Meeting of Members, followed by a simple bread meal and then some substantive lectures. The start time is approximately 18:45.
The following topics will be discussed.
UNIQUE ASIA
A feedback from the recent TTOW study trip to South Korea and Shanhai. The following projects will be reviewed.
* The Busan Geoje Fixed Link Project in which Strukton is handling the sinking of the elements at great depth
* The construction of Yangshan Deep Sea Port off the coast of Shanghai, a project in which DHV is involved.
* Two drilled tunnel projects where Herrenknecht TBMs rotated (with a nice animated film of a TBM)
* The construction of an underground distribution centre/parking garage (2 x 75,000 m2).
SINKING OF SINKING TUNES - FACT OR FACT?
The immersion of tunnels has been carried out with pontoons and ballast tanks for decades. Sinking by pulling down tunnel elements is a new phenomenon in sinking country. In early 2010, Strukton Afzinktechnieken will be one of the first companies in the world to apply this principle to the aqueduct on the N57 in Middelburg.
HONGKONG-ZHUHAI-MACOA LINK
A presentation by TEC on the new link to be built between mainland China and the Government of Hong Kong by means of 25 km of bridges and 6 km of immersed tunnel.
.
17.30 - 17.45 Reception
17.45 - 18.15 General Assembly
18.15 - 18.55 Bread meal and soup
18.55 - 19.00 Welcome
19.00 - 19.45 Study tour Shanghai (by Peter Hoogen and Jan Jonker, both Movares)
19.45 - 20.15 hrs Drawing down zinc elements (by Mark Vlaanderen, Mergor, Strukton)
20.15 - 20.45 hrs Break with drinks and snacks
20.45 - 21.30 hrs Hongkong-Zhuhai-Macoa Link (by René Kuiper, DHV/TEC)
21.30 hrs Closing
You are cordially invited. Please note that there is a maximum of 100 places available! Participation will be allocated in order of registration (via the reply form and via the website).
CANCELLING
If you have registered and are unexpectedly unable to attend, we would appreciate it if you could cancel in time. We can then admit people from any waiting list to the lecture afternoon.
.
Location
Restaurant Strukton, Westkanaaldijk 2
3542 DA Utrecht (entrance at no. 4)
Organiser
Tunnel Engineering and Underground Works
Name and contact details for information
Further information via the e-mail address below.
