Tirtha Kaloor
Extending Rijkswaterstaat’s Infrastructure Product Platform for Performance, Risk, and Cost Assessment: Incorporating Data-Driven Design Decisions in the Movable Bridge Early Design Phase
Societal context
Rijkswaterstaat (RWS) manages the national highway and waterway networks, which include approximately 127 ship locks and 157 movable bridges used daily by road and waterway traffic across the Netherlands. Most of these assets were built in the 1950s and 1960s. Because of their age, increasing traffic loads and harsh weather conditions, a significant number require major renovation or replacement within approximately two decades. This work must be delivered quickly and with minimal disruption to the public.
Innovation
Contractors currently design a unique solution for each asset, an engineer-to-order approach. This leads to more engineering effort, longer project durations, a broad range of spare parts and higher maintenance costs. RWS is therefore moving to a configure-to-order product platform in which assets are configured from standardized building blocks. My project extended this platform with quantitative reliability, availability and lifecycle cost (RAL) assessment. Today, design variants are compared through subjective qualitative scoring. With the extended platform, project teams can see quantitative metrics for each design choice and for the complete asset during configuration selection, before a formal RAMS analysis. A key element of the approach is the reuse of the existing standardized maintenance database at RWS (based on NEN 2767) as the data source. This brings maintenance knowledge into the early design phase through tooling and processes that RWS already uses.
Impact
The extended platform supports the RWS Asset Management 2.0 objective of balancing performance, risk and cost throughout the asset lifecycle. Well-informed early design decisions help ensure reliable assets with lower risk of unplanned downtime and lower lifecycle costs. The prototype was demonstrated on the movement mechanism of the Schiphol Bridge, where user acceptance testing with primary users and the platform maintainer confirmed that all project objectives were met. The platform also provides a structured place to record operational data and maintenance knowledge from existing assets, addressing the gap in knowledge transfer from maintenance to design identified by stakeholders. Because the architecture is asset-type independent, it can be extended to ship locks and other RWS assets, offering a reusable and scalable foundation for faster and better-informed infrastructure decisions. For the public, this means fewer unplanned closures of bridges and locks, less traffic disruption, and more effective use of public funds.
Leadership and collaboration
Entering a largely new domain, I learned reliability engineering and studied the working processes of several RWS departments in detail. Through structured interviews with asset managers, technical managers, systems engineers, maintenance engineers and RAMS advisors, I identified 57 problems across the asset lifecycle and combined these perspectives into one coherent solution. I applied a structured systems engineering approach (V-model, ISO 15288, SYSMOD) and sound software architecture practices, ensuring traceability from stakeholder needs to the validated prototype. I worked closely with the platform’s external developer to integrate the new components and wrote a user manual for users and the maintainer to support continued use. In the foreword to my thesis, my RWS supervisors highlighted my “ability to connect different disciplines, perspectives, and stakeholders.”