Description

The Sloe power plant is a Siemens-built natural gas-fired CCGT (Steam and Gas Turbine) with a total efficiency of no less than 59% and 870 MW of installed capacity.

Preparations for this started in 2006, June 2007 the first pile was driven while and the plant was finally handed over in early 2010.

Have the specifications been met, has the project stayed within schedule? The site manager at this project will talk about the experiences with this turnkey project and technology

18:15 Arrival and introduction
19:00 Dinner
20:30 Presentation and questions
22:00 Closing

Speaker(s)

Marcel Verdam, site manager at the Sloecentrale project

Location

Hotel de Buizerd

Spoorstraat 124,1723 NG Noordscharwoude

Organiser

Circle Alkmaar

Name and contact details for information

P.J. van Eenennaam

kringalkmaar@kiviniria.nl