Description

After a preparation period of just under a year, construction of this offshore terminal began in February 2016.

This project is being built by the Port of Rotterdam Authority for SIF.

The project consists of three parts: construction of shed for the manufacture of piles for wind turbines, a covered inlet harbour length ca. 110m and a sea quay of 450m with a retaining height of 30m.

During this excursion, an explanation of the design will be given and a visit to the work will be made

Speaker(s)

Caroline Bosschieter (Port of Rotterdam Authority)
Diederik de Bruik (SIF)
Teus Burger (Sweco/Grontmij)

Location

Europaweg, Maasvlakte 2 (200 m after Future Land

turn left onto work road to Offshore Terminal R'dam)

Organiser

Construction and Hydraulic Engineering

Name and contact details for information

Jarit de Gijt

j.g.degijt@tudelft.nl