Power Topics Seminar

For most businesses, waiting for the network operator to upgrade the grid is no longer an option. Are you at risk of fines for exceeding your contracted capacity, or are you on a waiting list? Fortunately, there is indeed scope within the limits. During this session, you’ll gain insight into the latest developments, real-life customer case studies and smart solutions.

Create room for growth on a full network without having to wait for the network operator.

During this Power Topic on Wednesday 24 June, we’ll show you that, in practice, your contracted capacity is often not the absolute limit of your technical capabilities

What will you learn during this session?

The myth of the full grid: Why your connection is often not yet at full capacity.

Unlocking hidden capacity: Do away with ‘lost’ power such as reactive power.

To measure is to know: The concrete steps HyTEPS takes to arrive at an efficient solution. From understanding power quality to a concrete solution.

Practical examples: We’ll discuss specific client cases where we’ve created extra capacity without the need for grid reinforcement or batteries.

Free to attend, but registration is required (Please note: maximum 30 places, first come, first served!)

Do you have any questions in advance? Please feel free to contact us (HyTeps) on +0492 371 212

or office@hyteps.nl.

Sign up now