Description

The programme includes three lectures on projects in the far south and north of the Netherlands. The first lecture is about the Grensmaas project where a large processing basin has been built. The second lecture on the successful piping tests at the IJKDIJK. The third lecture on design of the Wilhelminahaven quay wall, also primary flood defence.

17.00 - 17.30 Reception with coffee/tea
17.30 - 18.15 Lecture Grensmaas - design processing basin Itteren by
Renger van de Kamp, Witteveen+Bos
18.15 - 19.15 dinner
19.15 - 20.00 Lecture IJKDIJK - Full-scale piping tests, by Huub De Bruijn, Deltares
20.00 - 20.45 Lecture Wilhelminahaven - Design quay wall, by Erik Rabbers, BAM
20.45 - 21.30 Closing with drinks

Location

Witteveen+Bos

Leeuwenbrug 8, Deventer

Organiser

Geotechnics

Name and contact details for information

Mr A. Lengkeek, tel 0570 - 69 75 90. In connection with facility facilities, please register participation before 16 April (and any absences after registration).