Deep Sea Dredging
The presentation New approach to deep sea dredging took place on Thursday 8 September 2011.
Click here for the presentation.
Description
The new flexible dredging concept is a response to the increasing demand for raw materials, while sand winning locations are located further from shore at increased dredging depths. The RoRo Deep Dredge, which can work at a dredging depth of up to
-200 m, has specifically been designed to meet this demand and to challenge current technical limitations. Mark Winkelman will explain how the concept works and what research was carried out to ascertain the feasibility of the concept.
6:15 PM - 9:00 PM Networking with free soup and bread*
7:00 PM Starting time lecture
* Please indicate with your registration.
Speaker(s)
Mark Winkelman, Manager Research Damen
Location
Faculty Room, 3mE, TU Delft, accessible
through the entrance at Leeghwaterstraat 17
Organiser
Maritime Engineering
Name and contact details for information
Mirek Kaminski
