Building underground
Description
NEW PROJECTS/DEVELOPMENTS IN UNDERGROUND CONSTRUCTION
PROGRAMME READING DAY
1.45 pm Reception and welcome
14.00 pm Overview of planned and desired tunnels
by Ferry de Graaf; senior advisor, Rijkswaterstaat Department of Infrastructure
14.15 o'clock Schreudersstudieprijs 2008; winners Techniek
'Parking garage Tropicana'
by Jaap Peters, Rob Vinks and Don Zandbergen; Rotterdam University of Applied Sciences, Civil Engineering Road and Hydraulic Engineering
14.35 o'clock Tunnel A2 Maastricht according to consortium " Avenue 2"
'The green runner'--- 'Vanzelfsprekend'
by Bas van Aart; design manager
15.10 am Schreudersstudieprijs 2008; winners Conceptual Topics
'Stationsplein and underground theatre in Haarlem'
by Jeroen Derksen and David Windt; TU Delft, Bouwkunde
15.30 pm Break
15.45 pm Tunnel A2 Maastricht according to consortium 'Union of Maastricht'
'Surprising connections'
by Cedric Lageman; tender manager and Frank Nibbering; design manager Infra
16.20:00 Schreuders Study Prize 2008; honourable mention Engineering
'Drilling Double-O-Tube tunnels'
Erik Alink,TU Delft; Civil Engineering and Geosciences
16:40 Tunnel A2 Maastricht according to consortium 'BA2M'
'Cité en Route'--- 'The solution for connecting and flowing through'
do
Location
TU DELFT Civil Engineering Hall E
Organiser
Tunnel Engineering and Underground Works
Name and contact details for information
KIVI NIRIA TTOW p/a Centre for Underground Construction Attn: Ellen van Eijk Postbus 420 2800 AK Gouda Telephone: 0182-540660 Fax: 0182-540661
