Eelde airport runway extension
Description
The board cordially invites you to a meeting on Monday 12 September about the extension of Eelde airfield.
It recently became known that the Council of State has still not ruled on the extension of the runway. But, as it looks now, the ruling is expected by the end of this year. After the endless procedural delays, it is now hoped that work can actually start. You can hear what all will happen from those directly involved at this evening.
The meeting will be held in the VIP room in the airport's main/port service building.
On the airport grounds to the main building:
Go straight ahead towards services and businesses. Report to the barrier and turn right after the barrier. You drive past the control tower and then see a glass porch on the left. This is the entrance to the main/port service building. You can ring the bell here and report to reception. After the reception, you will find the VIP room on your right
20.00 Start
20.15 Introduction by Mr C. Stutterheim (Groningen Airport Eelde) about the airport
20.45 Introduction about the runway extension by Mr R. Dirksen (director Concessions and Area Development/Dura Vermeer Division Infra b.v.)
21.15 Questions and informal get-together
Location
VIP area main/port service building
Organiser
Northern Region
Groningen Engineering Association
Name and contact details for information
Ir. T.H.J. Sleyfer
Apply via
Ir. T.H.J. Sleyfer No later than 10 September via e-mail
thomas.sleyfer@planet.nl
